<strong>Description</strong><br>The subjects have been developed in two phases.<br />
<br />
Phase 1 comprises a workshop is of steel portal frame construction off a concrete floor, under a pitched roof with insulated aluminium cladding. The workshop benefits from an eaves height of 8.75m, electric roller shutter door, three hot air gas fired blowers and an 8 tonne crane. <br />
<br />
Phase 2 comprises a workshop is of steel portal frame construction off a concrete floor, under a pitched roof with insulated aluminium cladding. The workshop benefits from an eaves height of 8.75M,three electric roller shutter doors, AmbiRad heaters a 25T and 10T tonne crane. <br />
<br />
Office accommodation is also provided within the Phase 2 element. The current layout provides a mix of open plan, private cellular offices and meeting rooms. There is also a staff breakout area and locker room facilities are located on the ground floor. <br />
<br />
Secure yard space is provided which is surfaced in a mixture of concrete and tarmac. There is an opportunity to acquire additional office space within the building if required.<br><br>