<strong>Description</strong><br>The 4th floor was newly fitted out to CAT B by the Landlord ahead of the lease completion in 2023. The building underwent a full refurbishment in 2021 to deliver Grade A office accommodation throughout and a communal roof terrace with stunning views over St Paul's Cathedral and the City Tower cluster.<br><br><strong>Specifications</strong><br>- Fully Fitted<br />
- Shared 2,745 sq ft communal roof terrace <br />
- 1:8 sq m occupational density<br />
- Four pipe fan coil air conditioning<br />
- 2.7m floor to ceiling height<br />
- Double height reception<br />
- Part exposed services<br />
- Use of 144 building cycle spaces<br />
- Use of 14 building showers<br><br><strong>Terms</strong><br>Lease to June 2033, with a Tenant break in June 2027<br><br>